Carbon steel with high impact glass reinforced polypropylene saddle and carbon steel pipe space
V-block design cradles pipe through out the entire erection process
Clevis bolt spacer included as standard keeps the clevis lower strap from collapsing
Eliminates of wood blocks and standard shields, costly calcium silicate inserts, re-leveling of piping at each individual hanger after insulation is completed
Hanger load nut above clevis must be tightened securely to assure proper performance
Position the pipe on the saddle
Square cut adjoining insulation and butt the insulation ends to each other
Insulation joint is coated, caulked and taped following standard insulation practice used on flanges and valves
Notch insulation to fit around the saddle
Wood blocks and standard shields
Costly calcium silicate inserts
Re-leveling of piping at each individual hanger after insulation is completed
Anvil insulation saddle system clevises are fully tested and rated for a temperature range from 40 to 200 deg F
Extensive field-testing and inspection has been performed to confirm that the integrity of the insulation vapor barrier for chilled water systems are sustained with the 260 ISS
Each insulation joint should be properly coated, caulked and taped
The Anvil 260 (ISS) Insulation Saddle System reduces your overall installation time and greatly simplifies the way you insulate copper and steel pipe systems
Contractors can support insulated pipe with less parts and labor
The revolutionary design of the 260 ISS spreads the load evenly over the lower strap of the clevis
Standard/Approvals: ASTM E84 Class 1 25/60|UL E94V